02-22-2017, 10:24 AM
Right now, we're waiting on 1 part to arrive, and then we can make 9 more. With another set of parts, I think we can make about 10 more after that.
After we do those, I think we will need to redesign some of the project, and I don't know how soon that will get priority.
So, I guess we may do 2 small batches, but then the next real batch could be quite a while.
After we do those, I think we will need to redesign some of the project, and I don't know how soon that will get priority.
So, I guess we may do 2 small batches, but then the next real batch could be quite a while.
Card Fighters' Clash 2 English Translation ( http://cfc2english.blogspot.com/ )
Neo Geo Pocket Flash Cart and Linker Project ( http://www.flashmasta.com/ )
Avatar art thanks to Trev-Mun ( http://trevmun.deviantart.com/ )
Neo Geo Pocket Flash Cart and Linker Project ( http://www.flashmasta.com/ )
Avatar art thanks to Trev-Mun ( http://trevmun.deviantart.com/ )